Cost Estimates
TRC’s formula for analysis and cost estimating will be based on our first-hand knowledge of current labour/material/overhead and profit rates gathered from the contractors and suppliers we work with every day as well as data compiled through industry resources for current pricing trends, historical data and local conditions:
Project Types:
Concrete restoration – estimate of probable repair costs
Balconies / catwalks / decks
Post-tension repair
Drainage and water damage
Waterproofing – roofs, decks, balconies, building envelope
Parking structures
Pool and pool decks
Seawalls / retaining walls
Roof systems
Concrete Masonry Unit (CMU) repair / replacement
Stucco – evaluation and repair/replacement
High-rise special considerations, mid-rise facades
Ramps, bridges, other concrete structures